Mackinaw Wind Project
Located on Mackinaw City’s waste water plant, this project was comprised of two wind turbine generators, each standing at 230 feet high with three 85-foot blades. Windemuller’s team designed and installed the primary distribution system for the 5MW wind farm, but only 2MW of power were installed. These were the first utility scale wind turbines ever installed in the state of Michigan.